Drywall construction – installation of structure, insulation and final plasterboard cladding for ceilings and partition walls in single-family house rooms

The drywall construction system comprises two components: construction of walls and ceilings from plasterboards and drywall screeds.

Uroš NemecGradbeništvo · module Gradbeništvo · supervisor Benedikt Boršič · defence februar 2012
In brief

The project in five facts.

AuthorUroš Nemec
SupervisorBenedikt Boršič
ModuleCivil EngineeringCivil Engineering
Employer / clientAcademia
Year2012februar 2012
About the project

Challenge, approach and results.

The drywall construction system comprises two components: construction of walls and ceilings from plasterboards and drywall screeds.

Solution and method

The drywall construction system comprises two components: construction of walls and ceilings from plasterboards and drywall screeds. The drywall system reduces the duration of execution in terms of time, because there is no construction moisture and waiting periods are eliminated. Drywall construction using plasterboards is simple and environmentally friendly, which is why an increasing number of people are opting for this type of construction.

This type of construction is already well developed and established in our country, both in adaptations and new builds. It involves the construction of suspended ceilings, partition walls, various claddings, decorative ceiling designs, etc. A ceiling made from plasterboards (e.g.

Knauf) is particularly suitable for constructing ceilings in attic spaces or when renovating old spaces. Before this type of construction, all construction phases up to installations must be completed, which can be installed subsequently or just before the final assembly of boards (electrical installation, air conditioning, etc.). The assembly of plasterboards appears relatively simple at first glance, but it is not entirely so.

Drywall construction involves construction of a metal structure, which must follow a precisely determined measuring sequence, level or sloped. This is followed by ** installation of mineral wool insulation**, the minimum installation thickness of which requires approximately 15 cm. The function of mineral wool is good thermal and acoustic insulation.

The next phase is mounting plasterboards in sequence according to the constructed structure. The final phase of this construction is treatment of plasterboard joints, which includes installation of aluminium corner beads, taping and smoothing of plasterboard joints.

Vgradnja mavčnih plošč na strop pri suhomontažni gradnji
Diploma thesis

Full text

PDF of the diploma thesis (public).

Diploma thesis (PDF) ↓
Related

Module, programme and stories.

Module Gradbeništvo

Your diploma project for a real company.

A diploma thesis at Academia solves a challenge from a company – often the one where you do your 800 hours of placement. Read about the Gradbeništvo module or book a consultation.

800 hoursof placement in a company
97 %of graduates employed
Module Gradbeništvo →Apply 2027/28All diploma projects
Before you go

We will send you the curriculum, the study path and your funding and scholarship options.

No calls, no spam. One e-mail with everything you need to decide, and an invitation to a lecture.

By sending the form you agree that Academia may contact you by e-mail or phone. Privacy · unsubscribe at any time.